Jane Doe
·Client·via email·That's wonderful news — thank you for keeping me posted! Are we still on budget for the cabinets?
Conversations on Summit Ridge Residence, newest first.
11 messages need your OK · across your projects · only you can see them
That's wonderful news — thank you for keeping me posted! Are we still on budget for the cabinets?
left the extra lumber by the garage, lmk if you want it hauled off
rough-in photos are uploaded, can Sarah confirm the fixture wall before lunch?
"Yes that tile is perfect, go ahead and order it…"
Confirming paint-grade shaker cabinets for the kitchen and pantry. What lead time should we carry for fabrication and install?
Cedar Millwork
Yes, paint-grade shaker is included. Carry eight to ten weeks from final field measure, with install the following week.
Confirmed with - please review before Friday's walkthrough.



Owner approved . , here is the slab we discussed: https://stonesupplier.com/carrara-quartz-slab-3cm. Please keep the eased edge detail attached to .
Polished white quartz with soft gray veining, available in book-matched slabs for kitchen islands and perimeter counters.
Hi Sarah, framing is making great progress at Summit Ridge Residence. We are excited to share the next update with you soon.
Sarah Chen
That is wonderful news. Will we be able to see the rooms taking shape on our next visit?
Assigning to Clearview and grouping this into WO-1001 so the sub link has the same photo context.
Kirby has the rough-in correction list. Need the crawlspace moisture log signed before we call for the re-inspection.
Nina Patel
I added photos from the south crawlspace. Insulation repair is done, but the moisture log still needs the vendor signature.
Do not close this WO until the updated COI is attached. The sub-facing thread should stay focused on schedule only.
We can complete the three electrical punch items Tuesday morning. Updated COI is coming from the office.
Uploaded the revised site plan. The driveway note now matches the permit desk comment.
Mark Thompson
Good to issue with Friday field set after Sarah confirms the logistics note.
Photo looks clean. I will verify in person before we close the tile punch item.
Tile punch item is complete. We matched the replacement grout and left the spare tile in the garage.
Verified the stair landing item. Keep this WO marked needs re-notify until Clearview confirms the hallway return window.
First stair landing patch is complete. We will return Monday for the hallway prime coat and remaining touch-ups.
Revised ceiling plan uploaded for the master suite. Added the requested recessed lighting details.

Daily Log · 2026-08-12
Your roof went on today. The trusses are set and craned into place, so from the street the house finally has its shape. Next week the crew starts sheathing and the roof gets dried in.
Daily Log · 2026-08-11
The walls are getting their outer skin this week. We started on the north and east sides today.
Daily Log · 2026-08-10
Stair landing framing has to come out and go back in.
Daily Log · 2026-08-09